Universal Registration Document 2022

7.5.3 Routine agreements procedure

7.5 Related-party transactions

7.5.3 Routine agreements procedure

7.6 Material contracts

The information on the regulated agreements referred to in Article L. 225-38 of the French Commercial Code is contained in the Statutory Auditors’ special report, which is reproduced in section 7.5.2 “Statutory Auditors’ special report on regulated agreements” of this Universal Registration Document, section 7.5.2 of the 2021 Universal Registration Document and section 7.5.2 of the 2020 Reference Document.

Except for the contracts which may be described in chapters 1 and 5 of this Universal Registration Document or in the appendix to the consolidated statements for the fiscal year ended 31 December 2022, in chapters 1 and 5 of the 2020 Universal Registration Document and the 2019 Reference Document or in the appendix to the consolidated statements for the fiscal years ended 31 December 2020 and 2021, including the contracts described hereunder, EDF entered into no material contracts other than those concluded in the normal course of business over the last two years preceding the filing of this Universal Registration Document, the filing of the 2021 Universal Registration Document and the filing of the 2020 Reference Document.

7.6.1 Material contracts entered into in 2022

Material contracts entered into in 2022, other than those conducted in the normal course of business, by the Group, are the followings:

  • Agreement for EDF Trading Limited, a wholly-owned subsidiary of EDF, to sell
    100% of the share capital of EDF Energy Services LLC (EDFES), the retail
    business of EDF Trading North America, to BP (12 September 2022);
  • Agreement to sell EDF’s stake in the Sloe CCGT plant (870MW) in the
    Netherlands to EPH, the Czech power producer and grid operator
    (27 September 2022);
  • Agreement for Imtech, a subsidiary of Dalkia and the EDF group, to acquire
    SPIE UK (27 October 2022);
  • Agreement for EDF to acquire GE Stream Power’s conventional nuclear power
    plant island business (4 November 2022);
  • Agreement for Imtech, a subsidiary of Dalkia and EDF Energy, to sell 100% of
    the capital of the Irish subsidiary Suir Engineering Ltd to the British equity fund
    Duke Street (11 November 2022).

7.6.2 Material contracts entered into in 2021

Material contracts entered into in 2021, other than those conducted in the normal course of business, by the Group, are the followings:

  • settlement agreement between EDF and AREVA to resolve all disputes between EDF and AREVA relating to the Framatome acquisition agreement contract entered into in 2017 and their commercial relationship prior to the acquisition (29 June 2021).

7.6.3 Material contracts entered into in 2020

Material contracts entered into in 2020, other than those conducted in the normal course of business, by the Group, are the followings:

  • purchase agreement for Pod Point, a company specialized in electric charging station in the UK, by EDF Energy (13 February 2020);
  • sale agreement for Edison’s E&P Division entered into with Energean Oil and Gas (excluding Algeria and Norway) (17 December 2020).