Universal Registration Document 2021

1. The group, its strategy and activities

1.4.1.1.2 Nuclear power generation in France

The electricity generated by EDF in France from its fleet of nuclear power plants represented 88.6% of its total electricity generation in 2021 (excluding pumped storage hydropower), and 87,3% including pumped storage hydropower.

1.4.1.1.2.1 EDF’s nuclear fleet in France and its operation

EDF’s PWR model is divided into three series of available electrical power:

  • a 900MW series consisting of 32 operating units of (for a total power capacity of 29,010MW) with an average age of 39 years;
  • a 1,300MW series consisting of 20 operating units of (for a total power capacity of 26,370MW) with an average age of 33 years;
  • the N4 series, which is the most recent with an average age of 21 years, consisting of 4 operating units (for a total power capacity of 5,990MW);

for a total of 56 functioning units spread over 18 sites (1) owned by EDF, and constituting a total authorised capacity of 61,370MW as at 31 December 2021. With an average age of approximately 36 years, EDF’s nuclear fleet is about average compared to the fleets installed worldwide.

Gravelines, Penly, Chooz, Flamanville, Paluel, Cattenom, Nogent-sur-Seine, Saint-Laurent, Dampierre, Belleville-sur-Loire, Chinon, Civaux, Bugey, Blayais, Saint-Alban, Cruas, Tricastin, Golfech

The commissioning and most recent ten-year inspection (VD) dates for these units as of end-2021 are as follows (2):

Units Year of industrial commissioning Most recent ten-year inspection Next ten-year inspection
Bugey 2

Bugey 2

Year of industrial commissioning

1979

Bugey 2

Most recent ten-year inspection

2021

Bugey 2

Next ten-year inspection

VD5

Bugey 3

Bugey 3

Year of industrial commissioning

1979

Bugey 3

Most recent ten-year inspection

2013

Bugey 3

Next ten-year inspection

VD4

Bugey 4

Bugey 4

Year of industrial commissioning

1979

Bugey 4

Most recent ten-year inspection

2021

Bugey 4

Next ten-year inspection

VD5

Bugey 5

Bugey 5

Year of industrial commissioning

1980

Bugey 5

Most recent ten-year inspection

2011

Bugey 5

Next ten-year inspection

VD4 in progress

Dampierre 1

Dampierre 1

Year of industrial commissioning

1980

Dampierre 1

Most recent ten-year inspection

2011

Dampierre 1

Next ten-year inspection

VD4 in progress

Gravelines 1

Gravelines 1

Year of industrial commissioning

1980

Gravelines 1

Most recent ten-year inspection

2011

Gravelines 1

Next ten-year inspectionVD4 in progress
Gravelines 2

Gravelines 2

Year of industrial commissioning

1980

Gravelines 2

Most recent ten-year inspection

2013

Gravelines 2

Next ten-year inspection

VD4

Tricastin 1

Tricastin 1

Year of industrial commissioning

1980

Tricastin 1

Most recent ten-year inspection

2019

Tricastin 1

Next ten-year inspection

VD5

Tricastin 2

Tricastin 2

Year of industrial commissioning

1980

Tricastin 2

Most recent ten-year inspection

2021

Tricastin 2

Next ten-year inspection

VD5

Dampierre 2

Dampierre 2

Year of industrial commissioning

1981

Dampierre 2

Most recent ten-year inspection

2012

Dampierre 2

Next ten-year inspection

VD4

Dampierre 3

Dampierre 3

Year of industrial commissioning

1981

Dampierre 3

Most recent ten-year inspection

2013

Dampierre 3

Next ten-year inspection

VD4

Dampierre 4

Dampierre 4

Year of industrial commissioning

1981

Dampierre 4

Most recent ten-year inspection

2014

Dampierre 4

Next ten-year inspection

VD4

Tricastin 3

Tricastin 3

Year of industrial commissioning

1981

Tricastin 3

Most recent ten-year inspection

2012

Tricastin 3

Next ten-year inspection

VD4

Tricastin 4

Tricastin 4

Year of industrial commissioning

1981

Tricastin 4

Most recent ten-year inspection

2014

Tricastin 4

Next ten-year inspection

VD4

Gravelines 3

Gravelines 3

Year of industrial commissioning

1981

Gravelines 3

Most recent ten-year inspection

2012

Gravelines 3

Next ten-year inspection

VD4

Gravelines 4

Gravelines 4

Year of industrial commissioning

1981

Gravelines 4

Most recent ten-year inspection

2014

Gravelines 4

Next ten-year inspection

VD4

Blayais 1

Blayais 1

Year of industrial commissioning

1981

Blayais 1

Most recent ten-year inspection

2012

Blayais 1

Next ten-year inspection

VD4

Blayais 2

Blayais 2

Year of industrial commissioning

1983

Blayais 2

Most recent ten-year inspection

2013

Blayais 2

Next ten-year inspection

VD4

Blayais 3

Blayais 3

Year of industrial commissioning

1983

Blayais 3

Most recent ten-year inspection

2015

Blayais 3

Next ten-year inspection

VD4

Blayais 4

Blayais 4

Year of industrial commissioning

1983

Blayais 4

Most recent ten-year inspection

2015

Blayais 4

Next ten-year inspection

VD4

Saint-Laurent 1 Saint-Laurent 1Year of industrial commissioning

1983

Saint-Laurent 1Most recent ten-year inspection

2015

Saint-Laurent 1Next ten-year inspection

VD4

Saint-Laurent 2

Saint-Laurent 2

Year of industrial commissioning

1983

Saint-Laurent 2

Most recent ten-year inspection

2013

Saint-Laurent 2

Next ten-year inspection

VD4

Chinon B1

Chinon B1

Year of industrial commissioning

1984

Chinon B1

Most recent ten-year inspection

2013

Chinon B1

Next ten-year inspection

VD4

Cruas 1

Cruas 1

Year of industrial commissioning

1984

Cruas 1

Most recent ten-year inspection

2015

Cruas 1

Next ten-year inspection

VD4

Chinon B2

Chinon B2

Year of industrial commissioning

1984

Chinon B2

Most recent ten-year inspection

2016

Chinon B2

Next ten-year inspection

VD4

Cruas 2

Cruas 2

Year of industrial commissioning

1984

Cruas 2

Most recent ten-year inspection

2018

Cruas 2

Next ten-year inspection

VD4

Gravelines 5

Gravelines 5

Year of industrial commissioning

1985

Gravelines 5

Most recent ten-year inspection

2017

Gravelines 5

Next ten-year inspection

VD4

Gravelines 6

Gravelines 6

Year of industrial commissioning

1985

Gravelines 6

Most recent ten-year inspection

2018

Gravelines 6

Next ten-year inspection

VD4

Units Year of industrial commissioning Most recent ten-year inspection Next ten-year inspection
Cruas 3

Cruas 3

Year of industrial commissioning

1984

Cruas 3

Most recent ten-year inspection

2014

Cruas 3

Next ten-year inspection

VD4

Cruas 4

Cruas 4

Year of industrial commissioning

1985

Cruas 4

Most recent ten-year inspection

2016

Cruas 4

Next ten-year inspection

VD4

Chinon B3

Chinon B3

Year of industrial commissioning

1987

Chinon B3

Most recent ten-year inspection

2020

Chinon B3

Next ten-year inspection

VD4

Chinon B4

Chinon B4

Year of industrial commissioning

1988

Chinon B4

Most recent ten-year inspection

2020

Chinon B4

Next ten-year inspection

VD4

Paluel 1

Paluel 1

Year of industrial commissioning

1985

Paluel 1

Most recent ten-year inspection

2016

Paluel 1

Next ten-year inspection

VD4

Paluel 2

Paluel 2

Year of industrial commissioning

1985

Paluel 2

Most recent ten-year inspection

2018

Paluel 2

Next ten-year inspection

VD4

Paluel 3

Paluel 3

Year of industrial commissioning

1986

Paluel 3

Most recent ten-year inspection

2017

Paluel 3

Next ten-year inspection

VD4

Paluel 4

Paluel 4

Year of industrial commissioning

1986

Paluel 4

Most recent ten-year inspection

2019

Paluel 4

Next ten-year inspection

VD4

Saint-Alban 1

Saint-Alban 1

Year of industrial commissioning

1986

Saint-Alban 1

Most recent ten-year inspection

2017

Saint-Alban 1

Next ten-year inspection

VD4

Flamanville 1

Flamanville 1

Year of industrial commissioning

1986

Flamanville 1

Most recent ten-year inspection

2018

Flamanville 1

Next ten-year inspection

VD4

Saint-Alban 2

Saint-Alban 2

Year of industrial commissioning

1987

Saint-Alban 2

Most recent ten-year inspection

2018

Saint-Alban 2

Next ten-year inspection

VD4

Flamanville 2

Flamanville 2

Year of industrial commissioning

1987

Flamanville 2

Most recent ten-year inspection

2020

Flamanville 2

Next ten-year inspection

VD4

Cattenom 1

Cattenom 1

Year of industrial commissioning

1987

Cattenom 1

Most recent ten-year inspection

2016

Cattenom 1

Next ten-year inspection

VD4

Cattenom 2

Cattenom 2

Year of industrial commissioning

1988

Cattenom 2

Most recent ten-year inspection

2018

Cattenom 2

Next ten-year inspection

VD4

Nogent 1

Nogent 1

Year of industrial commissioning

1988

Nogent 1

Most recent ten-year inspection

2019

Nogent 1

Next ten-year inspection

VD4

Belleville 1

Belleville 1

Year of industrial commissioning

1988

Belleville 1

Most recent ten-year inspection

2021

Belleville 1

Next ten-year inspection

VD4

Belleville 2

Belleville 2

Year of industrial commissioning

1989

Belleville 2

Most recent ten-year inspection

2019

Belleville 2

Next ten-year inspection

VD4

Nogent 2

Nogent 2

Year of industrial commissioning

1989

Nogent 2

Most recent ten-year inspection

2020

Nogent 2

Next ten-year inspection

VD4

Penly 1

Penly 1

Year of industrial commissioning

1990

Penly 1

Most recent ten-year inspection

2011

Penly 1

Next ten-year inspection

VD3

in progress
Cattenom 3

Cattenom 3

Year of industrial commissioning

1991

Cattenom 3

Most recent ten-year inspection

2021

Cattenom 3

Next ten-year inspection

VD4

Golfech 1

Golfech 1

Year of industrial commissioning

1991

Golfech 1

Most recent ten-year inspection

2012

Golfech 1

Next ten-year inspection

VD3

Cattenom 4 Cattenom 4Year of industrial commissioning

1992

Cattenom 4Most recent ten-year inspection

2013

Cattenom 4Next ten-year inspection

VD3

Penly 2

Penly 2

Year of industrial commissioning

1992

Penly 2

Most recent ten-year inspection

2014

Penly 2

Next ten-year inspection

VD3

Golfech 2

Golfech 2

Year of industrial commissioning

1994

Golfech 2

Most recent ten-year inspection

2014

Golfech 2

Next ten-year inspection

VD3

Chooz B1

Chooz B1

Year of industrial commissioning

2000

Chooz B1

Most recent ten-year inspection

2020

Chooz B1

Next ten-year inspection

VD3

Chooz B2

Chooz B2

Year of industrial commissioning

2000

Chooz B2

Most recent ten-year inspection

2019

Chooz B2

Next ten-year inspection

VD3

Civaux 1

Civaux 1

Year of industrial commissioning

2002

Civaux 1

Most recent ten-year inspection

2011

Civaux 1

Next ten-year inspectionVD2 in progress
Civaux 2

Civaux 2

Year of industrial commissioning

2002

Civaux 2

Most recent ten-year inspection

2012

Civaux 2

Next ten-year inspection

VD2

(1) After the permanent shutdown in 2020 of the two 900MW Fessenheim units.

(2) EDF first-generation design plants have been gradually shut down and are currently being decommissioned. The Fessenheim plant has also been shut down in 2020 (see section 1.4.1.1.2.3 - C "Issues related to decommissioning of nuclear power plants”).