CAPACITY AND OUTPUT BY POWER PLANT

Power Plant

Power(1)(in MW)

Output(2)  (in TWh)

AGR Power Plants

 

2020

2019

Dungeness B

Dungeness B

Power(1)(in MW)

1,090

Dungeness B

Output(2)  (in TWh)

(0.2)

(0.2)

Hartlepool

Hartlepool

Power(1)(in MW)

1,185

Hartlepool

Output(2)  (in TWh)

8.5

7.6

Heysham 1

Heysham 1

Power(1)(in MW)

1,060

Heysham 1

Output(2)  (in TWh)

6.1

6.8

Heysham 2

Heysham 2

Power(1)(in MW)

1,240

Heysham 2

Output(2)  (in TWh)

8.9

10.3

Hinkley Point B

Hinkley Point B

Power(1)(in MW)

965

Hinkley Point B

Output(2)  (in TWh)

1.8

6.9

Hunterston B

Hunterston B

Power(1)(in MW)

985

Hunterston B

Output(2)  (in TWh)

2.3

1.0

Torness

Torness

Power(1)(in MW)

1,200

Torness

Output(2)  (in TWh)

9.9

10.1

PWR Power Plant

PWR Power Plant

Power(1)(in MW)

 

PWR Power Plant

Output(2)  (in TWh)

 

 
Sizewell B

Sizewell B

Power(1)(in MW)

1,198

Sizewell B

Output(2)  (in TWh)

8.4

8.5

TOTAL

TOTAL

Power(1)(in MW)

8,923

TOTAL

Output(2)  (in TWh)

45.7

51.0

LOAD FACTOR (3) 

LOAD FACTOR (3) 

Power(1)(in MW)

 

LOAD FACTOR (3) 

Output(2)  (in TWh)

58%

65%

(1) Capacities are stated net of all power consumed for the power stations’ own use, including power imported from the grid.

(2) Output in each year reflects any refuelling, planned and unplanned outages.

(3) Load factors are obtained by dividing the actual output by the output that would have been achieved by each power plant operated at its stated capacity appropriate for the period.

Operational review of the existing nuclear generation fleet

The nuclear generation fleet produced 45.7TWh during 2020, 5.3TWh less than 2019(51.0TWh). The reduction in output is largely due to:

  • the extended outages at Hinkley Point B for graphite inspections and safety casework,
  • a 50% reduction in output from Sizewell B, between May and September, at the request of National Grid, due to significantly lower than normal summer demand.

Ces baisses sont partiellement compensées par une diminution du nombre d’arrêts programmés en 2020.

These reductions are partly offset by fewer statutory outages in 2020.

Planned statutory outages were carried out on Heysham 2 Reactor 8 and Heysham 1Reactor 1. Planned statutory outages on Torness Reactor 1 and Hunterston B Reactor4 were deferred to 2021 due to the Covid-19 pandemic.

A statutory outage was started on Dungeness B Reactor 22 in Q3 2018 with an associated outage on Reactor 21 for work on common systems. These outages were extended to address corrosion on cooling water pipework and the discovery of steam pipework cracking and the units were expected to return to service in May/April 2020. Since then further safety case challenges have arisen in relation to flooding in the event of a boiler tube failure and in relation to a reactor pressure vessel component called the gas baffle. In recognition of the complexity which these cases present, the expected return to service has been put back to H1 2021.

Following extended outages for graphite core inspections and related safety casework, both units at Hunterston B returned to service during H2 2020. The intention is to run each reactor for two six months periods of operation, subject to a graphite inspection and further regulatory approval between each run. The decision has also been taken in 2020 to end power generation at Hunterston B no later than 7 January 2022.

Both reactors at Hinkley Point B are currently shut down while safety case work related to the graphite core continues. The expected return to service dates are H12021. The decision has been taken in 2020 to end power generation at Hinkley Point B no later than 15 July 2022.

CURRENT OPERATING LIVES* AND CLOSURE DATES

Power Plant

Type of reactor

Start of Generation

Power Station Lifetime (Formally Declared)

Life Extensions (Already Formally Declared)

Associated Scheduled Closure Date

Scheduled Periodic Safety Reviews

Hinkley Point B

Hinkley Point B

Type of reactor

AGR

Hinkley Point B

Start of Generation

Feb. 1976

Hinkley Point B

Power Station Lifetime (Formally Declared)

46 years

Hinkley Point B

Life Extensions (Already Formally Declared)

21 years

Hinkley Point B

Associated Scheduled Closure Date

2022

Hinkley Point B

Scheduled Periodic Safety Reviews

2017

Hunterston B

 

Hunterston B

 

Type of reactor

AGR

Hunterston B

 

Start of Generation

Feb. 1976

Hunterston B

 

Power Station Lifetime (Formally Declared)

46 years

Hunterston B

 

Life Extensions (Already Formally Declared)

21 years

Hunterston B

 

Associated Scheduled Closure Date

2022

Hunterston B

 

Scheduled Periodic Safety Reviews

2017

Dungeness B

Dungeness B

Type of reactor

AGR

Dungeness B

Start of Generation

Apr. 1983

Dungeness B

Power Station Lifetime (Formally Declared)

45 years

Dungeness B

Life Extensions (Already Formally Declared)

20 years

Dungeness B

Associated Scheduled Closure Date

2028

Dungeness B

Scheduled Periodic Safety Reviews

2018

Heysham 1

Heysham 1

Type of reactor

AGR

Heysham 1

Start of Generation

Jul. 1983

Heysham 1

Power Station Lifetime (Formally Declared)

41 years

Heysham 1

Life Extensions (Already Formally Declared)

15 years

Heysham 1

Associated Scheduled Closure Date

2024

Heysham 1

Scheduled Periodic Safety Reviews

2019

Hartlepool

Hartlepool

Type of reactor

AGR

Hartlepool

Start of Generation

Aug 1983

Hartlepool

Power Station Lifetime (Formally Declared)

41 years

Hartlepool

Life Extensions (Already Formally Declared)

15 years

Hartlepool

Associated Scheduled Closure Date

2024

Hartlepool

Scheduled Periodic Safety Reviews

2019

Torness

Torness

Type of reactor

AGR

Torness

Start of Generation

May 1988

Torness

Power Station Lifetime (Formally Declared)

42 years

Torness

Life Extensions (Already Formally Declared)

17 years

Torness

Associated Scheduled Closure Date

2030

Torness

Scheduled Periodic Safety Reviews

2020

Heysham 2

Heysham 2

Type of reactor

AGR

Heysham 2

Start of Generation

Jul. 1988

Heysham 2

Power Station Lifetime (Formally Declared)

42 years

Heysham 2

Life Extensions (Already Formally Declared)

17 years

Heysham 2

Associated Scheduled Closure Date

2030

Heysham 2

Scheduled Periodic Safety Reviews

2020

Sizewell B

Sizewell B

Type of reactor

PWR

Sizewell B

Start of Generation

Feb. 1995

Sizewell B

Power Station Lifetime (Formally Declared)

40 years

Sizewell B

Life Extensions (Already Formally Declared)

-

Sizewell B

Associated Scheduled Closure Date

2035

Sizewell B

Scheduled Periodic Safety Reviews

2025

*As formally recorded by EDF Energy and approved by the NDA.